City of Dallas, LBJ Managed Lanes Utility Relocations, Dallas, Texas

CRIADO was responsible for expedited design of various segments of water and wastewater relocation along I-635 and I-35 in preparation for the widening of I-635 for the implementation of managed HOV/Toll Lanes in the City of Dallas. The approximately 17-mile LBJ Express project encompassed fast-tracked improvements along IH-635 from Luna Road to Greenville Avenue, as well as on IH-35E between Loop 12 and Valwood Parkway. CRIADO provided the City of Dallas drawings, specifications and a cost estimate for 8-inch PVC and 10-inch Steel water line relocation for 2,700 linear feet. CRIADO also provided drawings, specifications and a cost estimate for the relocation of an 8-inch PVC water line and 12-inch PVC wastewater line for an existing water line conflict. Our team was also responsible for drawings, specifications, and a cost estimate for the relocation of 8-inch VCT wastewater line.