Dallas Water Utilities, Water & WW Main Replacements in Various Locations 2011, Dallas, Texas

Design and survey of 47,111 total linear feet of main replacements, approximately 30,371 feet of 8-12-inch water mains, and 16,740 feet of 8-inch wastewater mains at various locations. Responsible for preparation of the design reports, rehabilitation design and oversight of subconsultants for 30,371 linear feet of 8-12-inch water line and 16,740 linear feet of 8-24-inch wastewater rehabilitation in 33 different locations within the City of Dallas.  This project included an additional 36-inch wastewater line relocation from underneath existing structures, designed on an emergency basis. Survey services performed by CRIADO included existing right-of-way and easement research, utility coordination, field work and processing for preparation of easement documents.