DART, Blue Line South, Oak Cliff Corridor, Dallas, Texas

CRIADO performed utility relocation and coordination, horizontal and vertical design of water and wastewater lines, hydrologic analysis and storm sewer design at Camp Wisdom Station, sight distance analysis, horizontal and vertical roadway design and retaining wall profiling as a subcontractor for the South Oak Cliff Corridor Blue Line Extension (SOC-3) project. The SOC-3 project began at Ledbetter Station and extends to the University of North Texas Dallas (UNT Dallas) campus. The project included an extension of the Ledbetter Station platform as well as additional drop-off and access facilities. Two proposed stations were constructed.

  • Task Order 1 – Supplemental Topographic Survey for design UNT Station including record utilities for South Cliff Pump Station and existing pavement improvements in University Hills Drive.
  • Task Order 2 – Tree Survey for Camp Wisdom Station in accordance with City of Dallas Tree Protection Ordinance.
  • Task Order 3 – Supplemental construction staking for pier locations 5, 6, 7, & 8 on centerline of southbound track for proposed bridge crossing Five Mile Creek.