Water/Wastewater
Trinity River Authority of Texas (TRA), Mountain Creek Interceptor, Dallas, Texas

CRIADO was responsible for evaluating and recommending various stream bank stabilization options to prepare a Technical Memorandum for Trinity River Authority to select a specific type of system. This project involved the removal of approximately 7,000 linear feet of existing segment 30MC-1, 54-inch wastewater line and replacement with a proposed 84-inch RCP wastewater line. The project scope included preparing traffic control plans, erosion control plans and specifications related to the erosion control. Additionally, CRIADO’s experience on this project included bypass pumping specifications and cost estimates.