Subsurface Utility Engineering
Criado Portfolio No Photo

CRIADO is performing utility engineering for the construction of the widening of US 82 from 2-Lanes to 4-Lanes, a distance of 19.7 miles. The CRIADO team will be responsible for identifying existing and proposed utilities (public and private), structures, neighborhood communities, historical landmarks, and undeveloped areas for review. The project includes ten test holes, Quality Levels B, C, and D SUE services. CRIADO engineers will propose the schematic designs for alternative alignments to minimize displacements and damages.